Money
How to compare installer quotes by unit cost and rated performance
Two quotes rarely describe the same job. Put them on the same footing first, then compare the cost per unit, the ratings and the warranty.
By VoltHearth Editorial Team Updated 6 min read
- Solar unit cost
- Price ÷ watts of capacity
- Get quotes
- Itemized and in writing
- Proposal should list
- Model numbers and warranty
- Federal 25C and 25D
- Ended after 2025
At a glance
Ask each installer for an itemized written quote, then compare the same things across all of them. The DOE says to convert each solar quote to cost per watt by dividing the system cost by its capacity in watts, which is the kilowatts times 1,000. ENERGY STAR says to compare cost, energy efficiency and warranties, and to have the written proposal list model numbers, schedule and warranty before work starts. VoltHearth gives no prices here, only the method.
Put the quotes on the same footing
A quote is only comparable if it names what is being installed. ENERGY STAR advises getting itemized written estimates and comparing cost, energy efficiency and warranties, and notes that the lowest bid may cost more over time if the equipment is less efficient. It also says to sign a written proposal before work starts, and that it should specify project costs, model numbers, the job schedule and warranty information.
| Line | What to write down | Why it matters |
|---|---|---|
| Equipment | Manufacturer and model number of each major item | The model number lets you look up the rated performance |
| Capacity | Rated size: watts for solar, rated capacity for heating and cooling | It is the denominator for the unit cost |
| Scope | What is included: electrical work, ductwork, roof work, permits, removal of old equipment | A cheaper quote may leave out a line another includes |
| Warranty | What is covered, for how long, and who honors it | ENERGY STAR and DOE both point to warranties as a comparison point |
| Schedule | Start date and completion date | The proposal should state the job schedule |
Compare by unit cost
A unit cost divides the total price by the rated size, so a larger system and a smaller one can be compared. For rooftop solar the DOE gives the method: divide the system cost by its capacity in watts, which is kilowatts times 1,000. The DOE adds that rates for the same job vary between installers, so it advises getting quotes from several.
Here is the logic with ratios and no prices. If quote B costs 10% more than quote A but the system is 25% larger, B's cost per watt is 1.10 divided by 1.25, or 0.88 of A's, which is 12% lower per watt even though the total is higher. The total price answers what you will pay. The unit cost answers what each watt of capacity costs. You need both.
For heating and cooling equipment a cost per unit of capacity is less useful. ENERGY STAR says sizing should reflect the house, its insulation and its windows, and that a bigger system is not always better. Compare the itemized lines for the same scope instead, and use ratings to compare efficiency.
Compare by rated performance
Each major item has a rating on the manufacturer's specification sheet. For heat pumps and air conditioners those are SEER2 and HSPF2, and for gas furnaces AFUE. The guide to efficiency ratings explains what each measures. ENERGY STAR says qualified products meet efficiency guidelines set by the EPA and that contractors should show you savings calculations for the equipment. Ask to see the calculation and the assumptions, and run it through the upgrade savings calculator with your own bills.
For heating and cooling, ENERGY STAR also expects a home evaluation. It says the contractor should inspect the system and the house, check ducts for leaks and insulation if you have them, and measure airflow against the manufacturer's specifications. Ask whether the quote's equipment size rests on an evaluation like this.
Questions to ask every installer
- Licensing and insurance. ENERGY STAR advises learning your state's contractor license and insurance requirements first. The DOE advises confirming a solar installer is licensed, bonded and insured for residential solar in your area.
- Subcontractors. The DOE says to ask whether subcontractors will be used, to verify their credentials, and to know which parts of the project they handle.
- Experience and references. Ask how long they have been in business and how many systems they have installed. Both agencies advise calling references about quality, schedule and budget.
- Permits and inspections. Electrical, gas and panel work should be done by a licensed professional with permits pulled. Ask who applies for the permit and who is present at inspection.
- The roof. The DOE advises asking whether the roof needs repair first and who is responsible if it is damaged or leaks, and having roof repairs in the proposal.
- Warranty. The DOE says to ask what the warranties cover if a component or the system fails after installation.
The DOE also advises asking the installer to explain which incentives you qualify for and how they work. Check any answer against a government source. The IRS says the 25C credit does not apply to property placed in service after December 31, 2025, and that 25D does not apply to expenditures made after that date. See what happened to 25C and 25D.
When the offer is a loan, lease or PPA
A financed or leased offer changes what you are comparing. The FTC lists terms to read: the length of the contract, whether payments rise and by how much, who receives the tax credits, minimum production, who pays for repairs, early termination fees, end-of-term options and what happens if you sell the home. For a loan it advises asking what you pay up front, the annual percentage rate, whether payments change, whether there is a balloon payment and whether a lien is placed on the home. Compare the total you would pay over the whole term, not the first monthly payment. More is in leased solar and the business credit and financing energy upgrades.
Quick answers
How many quotes should I get?
The DOE advises getting quotes from several solar installers because rates for the same job vary. The pages checked do not give an exact number.
Is the lowest quote the better deal?
Not necessarily. ENERGY STAR says the lowest bid may cost more over time if the equipment is less efficient. Compare unit cost, ratings, warranty and scope.
What is cost per watt?
The system cost divided by its capacity in watts. A 1 kilowatt capacity is 1,000 watts, per the DOE.
Should the quote count a federal tax credit?
The IRS says 25C and 25D ended for work finished after 2025. Compare quotes before any incentives and add incentives separately, from sources you have checked.
Sources
- ENERGY STAR — 10 Tips for Hiring a Heating and Cooling Contractor
- U.S. Department of Energy — Decisions, Decisions: Choosing a Solar Installer
- FTC — Solar Power for Your Home
- IRS — FAQs on changes to sections 25C, 25D, 30C and 45L under Public Law 119-21 (FS-2025-05)
Facts on this page were checked against these sources on November 19, 2026. The DOE article was published August 31, 2021 and last modified May 14, 2026, the FTC page was last modified December 9, 2025, and the ENERGY STAR page is undated. The unit-cost ratio example is arithmetic, not a price. VoltHearth does not sell or install anything and does not recommend an installer.
Read next
-
Credits and rebates
Financing energy upgrades
Six ways to finance an upgrade and a worked loan payment with the formula.
-
Credits and rebates
What happened to 25C and 25D
Both ended after 2025. What still counts on a 2025 return and what carries forward.
-
Upgrade
Efficiency ratings explained
What SEER2, HSPF2, AFUE and UEF measure, federal minimums and how to price a rating.