Skip to content
VoltHearth

Power and backup

Electrical panel upgrade: what the amps mean and when you may need one

Adding a heat pump, an EV charger, solar or a battery can push an older panel past its limits. Read the label, then let a licensed electrician decide.

By VoltHearth Editorial Team Updated 6 min read

Panel upgrade, ENERGY STAR
$1,000 to $2,500
Utility service upgrade
$2,000 to $30,000
Federal credit (25C)
Ended Dec. 31, 2025
Who does the work
Licensed electrician
Illustration: an electrical panel with labeled breakers beside a heat pump and a car charger

At a glance

An electrical panel upgrade is a licensed electrician's job, and ENERGY STAR puts a panel upgrade at $1,000 to $2,500. If your utility must also upgrade the service line, ENERGY STAR gives a range of $2,000 to $30,000. You may not need either: ENERGY STAR says a home with a 200 or 225 amp main breaker and several empty slots may not, and a home that already has central air conditioning should not need an upgrade for a heat pump. The federal 25C credit for panelboards ended after 2025.

What a panel does and what amps mean

The electrical panel is the box that takes power from the utility and splits it into circuits, each protected by a breaker. The main breaker sets the limit for the whole house, and it is rated in amps. ENERGY STAR says the switch should state how many amps the panel receives, and that a higher number means more capacity.

Amps are not kilowatts. Multiply amps by volts to get watts: a 200-amp service at 240 volts is rated for 48,000 watts, or 48 kW, at its limit (240 × 200). Homes never draw that much for long, and an electrician checks whether the service can carry the loads you plan to add. Do not remove any cover to look inside. Read the label on the outside, and ask a licensed electrician about anything you cannot read.

Signs an upgrade may be needed

ENERGY STAR's rule of thumb for panel capacity
Main breakerEmpty slotsENERGY STAR's read
65, 100 or 125 ampsVery few or noneAn upgrade may be needed
200 or 225 ampsSeveralAn upgrade may not be needed

ENERGY STAR adds that older homes without central air conditioning might have a 100-amp panel, newer homes often have 200 amps, and a home that already has central air conditioning should not need an electrical upgrade to switch to a heat pump. The New York State energy office's MyEnergy page agrees that a 200-amp panel is typically enough to power a home, and that some households need electrical upgrades before installing clean equipment, solar or an EV charger.

Panel upgrade versus service upgrade

A panel upgrade replaces the box inside your home. A service upgrade is different: it changes the utility lines that deliver power to the house. ENERGY STAR says a service upgrade may be needed if a panel upgrade requires more power from the utility, and that it can be very expensive and time-consuming.

The MyEnergy page says that, depending on your service and new demand, you may need to contact your utility about a service upgrade, which can add cost. It also says panel costs rise with the number of added circuits, the length of wire and how hard the wiring is to reach, and that coordinating with other remodeling can lower costs.

The ranges below are the ones on the government pages as read on November 19, 2026. They are national ranges, not a quote.

  • Panel upgrade: $1,000 to $2,500 (ENERGY STAR; the MyEnergy page gives the same range).
  • Service upgrade: $2,000 to $30,000 (ENERGY STAR).
  • Smart circuit or load-sharing device: typically around $500 (ENERGY STAR).
  • Smart panel: $2,500 to $4,000 (ENERGY STAR's estimate).

Ways to avoid upsizing

Rearrange what is there

ENERGY STAR suggests asking the electrician to optimize the existing panel, for example by combining underused circuits or swapping some double-pole breakers for single-pole ones.

Share one circuit

Smart circuit or sharing devices let one breaker serve two heavy loads, such as a dryer and an EV charger, so that they do not run at full power together.

Choose lower-demand equipment

ENERGY STAR's example is a 120-volt Level 1 EV charger in place of a 240-volt Level 2 charger. A smaller load can fit without changing the panel.

Cut the load first

ENERGY STAR lists insulating and sealing the attic so heating and cooling equipment uses less energy. See attic insulation and home energy audit.

Safety and what to ask the electrician

Work inside a panel carries a risk of shock, fire and a failed connection that can stay hidden for years. Have a licensed professional do it, and have the permit pulled. ENERGY STAR says to confirm the electrician is fully licensed and insured and is pulling a permit or following the electrical code requirements, and the MyEnergy page says to always work with a licensed electrician when changing a panel or home wiring. This page gives no instructions for the work itself.

  • Can my present service carry the heat pump, charger, solar or battery I plan? What did you check to decide?
  • Is a panel upgrade enough, or does the utility need to upgrade the service, and who orders that?
  • Could a load-sharing device or a circuit rearrangement do the job instead?
  • Who pulls the permit, and what inspection follows?
  • How long will the power be off, and what does the written quote include?

If you plan other equipment, see heat pumps, rooftop solar and home batteries, because each one changes what the panel must carry.

Credits and help now

The Energy Efficient Home Improvement Credit (25C) covered panelboards rated 200 amps or more, up to $600 per item inside the $1,200 annual limit. The IRS says 25C does not apply to property placed in service after December 31, 2025, so a panel finished in 2026 gets no federal credit. See what happened to 25C and 25D.

The Department of Energy lists electric wiring and load service center upgrades among the uses of its electrification rebates, but says these rebates are available only in select states. DOE changed the program rules in May 2026, so ask your state energy office, and your utility, what is covered now and whether approval is needed before work starts. The rebate guide explains the programs.

Quick answers

How do I know what size my electrical panel is?

Read the amp rating on the main breaker, usually a switch at the top of the panel, without removing any cover. If it is unclear, ask a licensed electrician to read it.

Do I need a 200 amp panel for a heat pump?

Not always. ENERGY STAR says a home that already has central air conditioning should not need an electrical upgrade to switch to a heat pump. A licensed electrician should confirm for your home.

Can I upgrade my panel myself?

No. Have a licensed, insured electrician do it and pull the permit. Both ENERGY STAR and the New York State energy office say to use a licensed electrician.

Is there a tax credit for a panel upgrade?

Not for one finished after December 31, 2025. The 25C credit for panelboards ended on that date. Ask your state energy office and utility about rebates.

Sources

Facts on this page were checked against these sources on November 19, 2026. Cost ranges are the ones ENERGY STAR and the New York State energy office publish; they are not quotes and vary by home and region. VoltHearth is not an electrician or an installer.